.

Home > Guide to Factory Installation Procedures > Water Pollution Control Act Profiles

Guide to Factory Installation Procedures

Water Pollution Control Act

Followings are applicable when procedures based on laws or ordinances, etc. are required.
Name of laws and regulations Water Pollution Control Act
When
(The timing of procedures)
60 days prior to the installation, or modification of specific facilities ( sewage or waste liquid).
Who
(Procedure Targets)
Those who intend to install or modify specific facilities.
What
(Documents)
Notification indicating such as the type of facilities, structure, use method, processing method of sewage, etc., polluted level and volume of discharged water.
Download
Download file is Word97/for Win format.
If unable to download, please inquire to"Contact for Inquiries".
Where
(Procedure Office)
Prefectural Health Welfare Center Environment Department, via Municipal Environment Conservation Section in charge which ruling the location of the factory. (in Utsunomiya, City Environment Department Environment Conservation Section)
How
(Examination Contents)
To examine whether to comply with the criteria of drained water , etc., specific instructions are provided when it is necessary.
Processing Period Approximately 2 months
Contact for Inquiries
Tochigi Prefecture Department of Industry, Labor and Tourism, International Section 
TEL: 028-623-2194 
FAX: 028-623-2199

Return to Top