.

Home > Guide to Factory Installation Procedures > City Planning Act, Article 53.Profiles

Guide to Factory Installation Procedures

City Planning Act Article 53.

Followings are applicable when procedures based on laws or ordinances, etc. are required.
Name of laws and regulations City Planning Act Article 53.
When
(The timing of procedures)
Prior to the construction.
Who
(Procedure Targets)
Those who intend to construct buildings within the city planning areas or the urban development projected areas.
What
(Documents)
・Permission application.
〔Attachment Documents〕
・Location map (a scale of more than 1:500)
・Sketch of neighbors.
・More than 2 sections of section drawings of the building ( front and side views in a scale of more than 1:200).
・Other drawings(plane view) reference items and other necessary items.(in the case of steel construction, a lay face down drawing).
・Permission Application for the City Planning Act Article 53.
※In towns, only projects within the areas decided by the prefecture such as city planning facilities.
※For an application for other projects, please inquiry to each municipal section controlling the city planning.
Download
Download file is Word97/for Win format.
If unable to download, please inquire to"Contact for Inquiries".
Where
(Procedure Office)
・Municipality Section in charge of city planning.
How
(Examination Contents)
Flow of Procedures
Processing Period Basically 13 days.
Contact for Inquiries Tochigi Prefecture Department of Industry, Labor and Tourism, International Section 
TEL: 028-623-2194 
FAX: 028-623-2199

Return to Top