.

Home > Guide to Factory Installation Procedures > Poisonous and Deleterious Substances Control Act Profiles

Guide to Factory Installation Procedures

Poisonous and Deleterious Substances Control Act

Followings are applicable when procedures based on laws or ordinances, etc. are required.
Name of laws and regulations Poisonous and Deleterious Substances Control Act
When
(The timing of procedures)
Please make a prior contact to the Pharmaceutical Affairs Section Regulatory Affairs Examination in charge.
Who
(Procedure Targets)
Poisonous and deleterious substances manufacturer or importer
What
(Documents)
Registration application documents
Poisonous and deleterious substances manufacturing business and import business application
FD Application is necessary through the Operator Registration System.
System is available at "Contact for Inquiries".
Where
(Procedure Office)
Tochigi Prefecture
How
(Examination Contents)
Contents in accordance with the Poisonous and Deleterious Substances Control Act.
Flow of Procedures
Processing Period (Standard Processing Period)
Authorization by the Governor   30 days.
Authorization by the Minister   30 days.
Contact for Inquiries Tochigi Prefecture Department of Industry, Labor and Tourism, International Section 
TEL: 028-623-2194 
FAX: 028-623-2199

Return to Top